Page 1

20330AC

INSTALLATION & OPERATIONAL MANUAL FOR PRE-HUNG STORM DOOR Tools & Materials You Will Need: • Measuring Tape • Hammer • Level • Hacksaw • Pliers • Drill Bits - 3⁄32", 5⁄16" • Power Drill • Square • Stiff Utility Knife • Pencil • Soft Mallet • Phillips and Flathead Screwdrivers Installation Screwpack Contents: REMEMBER: ALWAYS USE THE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT. This Installation and Operational Instruction Manual is for ProVia Storm Door Models operating with self-storing sashes or with stationary sash and screen inserts. Door slab with attached z-bars for header, hinge and latch side. Bottom expander will be attached to bottom of door slab. Screw cap covers, vinyl sweeps and hardware kit will ship inside door carton separately from door slab. (1) pk #7 x 1" Phillips Panhead Screws (1) pk #6 x 1" Phillips Panhead Screws (1) pk #8 x 1 1⁄2" Phillips Truss Head Screws (2) #6 x 1⁄2" Phillips Panhead Screws - color matched For hinge side of leaf zbar mounted onto jamb For exterior mounting of z-bar frame for both leaf and piano hinge z-bars For hinge side of piano zbar mounted onto jamb For bottom expander Sash Clips & Thumbscrews - see inside hardware box Your Package Should Contain The Following Components: Homes built before 1978 may contain lead paint. All replacement installations must comply with the U.S. EPA’s Lead-Based Paint Renovation, Repair, and Painting Program (RRP Rule). Read more about the RRP Rule and lead-safe work practices, on the U.S. EPA’s website at: www.epa.gov/lead ! 1


20330AC
To see the actual publication please follow the link above