Page 2

19196AJ

THE ECONOMY The Town widely uses advertising, promotions, and social media to publicize the vacation and leisure opportunities in Ocean City, increasing from $2.1 million a decade ago to $6.5 million in 2016. For the year ended June 30, 2016, room sales were 5.3% above the prior year and food and beverage sales were up 5%. There were 1,855 construction permits issued in 2016, compared to 1,472 in 2015. The estimated value of construction in 2016 was $61,003,886 compared to $58,888,098 in 2015. Eight hotels having over 700 rooms are under construction or in the permitting process with an estimated construction value of $64 million dollars. MAJOR INITIATIVES AND DEPARTMENTAL ACTIVITIES FIRE HEADQUARTERS RENOVATIONS The Fire Headquarters building, located at 15th Street and Philadelphia Ave was originally constructed in 1960 as a single �������� �������� ������������������ �������� ������������������ �������� �������������� ������ �������������������������������������������������������������������������������������������� engine bays and as headquarters for the Ocean City Fire Department. The current $2.1 million project consists of a complete exterior renovation with new roof, siding, doors and windows and was funded by the sale of bonds in 2012. The new doors and windows have impact resistant glazing for storm protection. The engine bays were renovated with new paint, floor slabs and drain systems in the north bay and a new direct connection vehicle exhaust ventilation system throughout. New HVAC systems have been installed in the �������������������������������������������������������������������������������������� foot addition was constructed to provide ���������������������������������������������������� �������������������������������������� for both the career and volunteer staff. 1ST STREET WATER TOWER In 2013, a study was conducted to assess the water distribution with regards to the �������� �������� ������ �������� downtown area of Ocean City. As a result of that study, the Town decided to erect a new water tower in the downtown area and replace two aging water towers. The Town solicited bids for the project and the bid was awarded to Chicago Bridge and Iron Constructors (CB&I) of New Castle, Delaware. The new water tower is located at 1st Street. The $4.9M project was funded by the 2015 General Obligation Bonds. The new water tank will enhance �������� ���������� ���������������� ������������ ���������������� ������ ���������� ������ �������������� ������������������������ �������������� ������������������������������������������������������������������������������ ������������������������������������������������������������������������������ of the water tower in the Worcester Street parking lot, one of the busiest ���������������������������������������������������������������������������� of the water tower at 15th Street allows for the future expansion of the Page 2 ������������ ���������� �������������������� ���������� ������������������ In June 2015, the design on the water tower was selected by the Mayor and City Council of a beach ball splashing down. The paint used on the new ������������ ������������ ������ ���� ���������������� ������������������ brand and has a life expectancy of ���������������������������� ������ �������������� ������������ ������ double the life expectancy of the paint on the old water towers. With this ������������������������������������������������������������������������������ �������������������������������������������������������������������������������� �������� ������������ ������ ���������� �������� ���������������� ���������� ����������������������������������������������������������������������������


19196AJ
To see the actual publication please follow the link above