Page 98

20023AG

Stitch it OutINSTRUCTIONS Place a piece of batting over the squaring stitch completely covering the entire area. C D Trim the excess batting as close to the tack down stitches as possible. Run the next machine step which is the tack down stitch for the base fabric. A To start, hoop a piece of no-show mesh stabilizer to fit hoop. Load your first design and run the first machine step which is the squaring stitch. Step 2 of the design will tack the batting in place. Once the batting is trimmed, place your base fabric over the batting area. Be sure to have at least a 1/4” seam allowance on all sides. B E F 96 www.anitagoodesignonline.com


20023AG
To see the actual publication please follow the link above