Page 3

20330AC

Step 3- With the recorded measurements, verify with bar coded label on cardboard box and paperwork to make sure the size and order information is correct. Step 4- Carefully cut straps, unpackage door and remove cardboard. Step 5- Lay door flat down with exterior side down. Step 6- Remove the shipping tape from sash and door. Step 7- Remove glass and screen insert(s). 2 MEASURE FOR Z-BAR HEIGHT If Eastern Z-Bar is ordered, a 1⁄4" spacer has been attached to rear side of z-bar. At ! installation, drill 1⁄8" holes through spacer using installation holes in z-bar as a guide. 3 1 MEASURE & INSTALL 1234567.001 1234567.001 *1234567.001* ORDER SIZE: 32 x 80 901001 - PROVIA MODEL: 397 FULL VIEW PO #: PROVIA JOB: PROVIA PKUP 150 LOAD: 10/06 TAG#: BACK SUGARCREEK Quality Check 397-01 31 1/8 x 79 1/8 3 _____ screw covers _____ screen _____ TAG: BACK _____ Right Hinged Pre-Hung _____ Snow Mist White _____ DH230 RH AB Contemporary Lever _____ Prep Left for Handleset (Std 39”) _____ DH305 White Hd Touch’hold Closer 2 STD SD1006A ! Important! You will receive door with sash and screen mounted into door frame and secured with blue shipping tape. 6 Remove blue shipping tape Rivnut locations 7 Remove Sash & Screen Step 1- If you purchased a door with handleset prep, double check location of handleset prep and make sure it does not interfere with prime entry door handleset. Step 2- Subtract 1⁄8" from opening height measurement. Using this result, measure hinge and latch side z-bars from the top of door. There are 2" of excess z-bar at bottom of door. Your measurement will fall in this area. Mark and cut z-bars (see illustration). Step 3- Wipe door slab down with a soft cloth to remove any metal burrs. 2 Cut here 1⁄8" less than opening Latch side z-bar


20330AC
To see the actual publication please follow the link above