Page 17

20643CA

SEGMENTS Segment Clarcona - Ocoee Rd to SEM. Co. PD&E: $90,000 Design: $1,000,000 OF THCoEnstruct Segment: Brevard Co. L ion: $5,558,25 COAST-SSUUMMTTEERR TO-LLAAKKEE COAST TRAIL SEMIINOLLE Center Hill Withlacoochee State Forest Pinellas Trail – Pinellas County – The 47-mile multi-use trail from St. Petersburg to Tarpon Springs is one of the premier trails in Florida and forms the western end of the Coast-to- Coast Trail. Starkey Wilderness Trail – Pasco County – Located at Jay B. Starkey Wilderness Park, the 7.2 mile paved trail will be linked to the Pinellas Trail at the east and now links to the Suncoast trail to the west. Suncoast Trail – Hillsborough, Pasco and Hernando Counties – The 41 mile trail parallels the Suncoast Parkway, it currently links to the Starkey Trail and will link to the Good Neighbor Trail. Good Neighbor Trail – Hernando County – 10-mile trail east from Brooksville, will link with the Withlacoochee State Trail. 4 miles is currently paved. Withlacoochee State Trail – Hernando, Citrus and Pasco Counties, 46 miles. A portion of the trail will be part of the Coast-to-Coast Trail between the Good Neighbor Trail and Van Fleet State Trail. Van Fleet State Trail – Polk, Lake, Sumter Counties – Totally rural 29 mile rail-trail with one curve and no hills through the Green Swamp. A portion of the trail will be part of the Coast-to-Coast Trail between the Withlacoochee and South Lake Trails. South Lake Trail – Lake County – Together with the Minneola Scenic Trail, runs 13 miles from Clermont east to connect with the West Orange Trail as part of the Coastto Cost Trail. West Orange Trail – Orange County – This is a 22 mile, world-class rail trail through urban and suburban sections of Orange County. Part of the Coast-to-Coast Trail from the South Lake Trail to Clarcona, where a gap remains to be filled to link the Seminole Wekiva Trail. Clarcona-Ocoee Trail – Orange County – A 3 mile connector trail between the West Orange Trail and Seminole-Wekiva Trail. Winter Garden OORRAANNGGEE Seminole Wekiva Trail – Popular 14-mile Seminole County trail, part of the Coast-to-Coast Trail from its south terminus at US441 to the bridge over I-4 at Lake Mary. Rinehart Trail – Seminole County – From connection with the Seminole-Wekiva Trail at the bridge over I-4 in Lake Mary, 5 miles along Rinehart Road and CR46 to Lake Monroe Wayside Park (portions under construction). Spring to Spring Trail – Volusia County – From Lake Monroe Park in DeBary, when completed it will total 26 miles. One leg runs north to DeLeon Springs. To the east from DeBary it is part of the Coast-to-Coast Trail, connecting to the East Central Regional Rail Trail at Green Springs Park in Enterprise. East Central Regional Rail Trail – Volusia and Brevard Counties – When complete, will total 50 miles. Links to the Spring-to-Spring Trail at Green Springs Park in Enterprise. To the east, it proceeds through Osteen to Guise Road where a gap remains to Maytown. From Maytown, one leg goes north to Edgewater, but the leg south to Titusville is part of the Coast-to-Coast Trail. Volusia County, 12 miles (Enterprise to Maytown) – Bridge over SR415 in Osteen has been completed, trail completed from Enterprise to Guise Road in Osteen. Brevard County, 12 miles (Maytown to Titusville) – Under construction. A portion from I-95 at Mims to Titusville has been completed but not open to riders until remainder completed, tentative opening date October 2017. A bridge now goes over Garden Street in Titusville and a ���������������������������������������������������������������������������������������������������� Brewer Bridge is marked by a 12-foot striped bike lane along Main Street and Indian River Avenue. Canaveral National Seashore – Brevard County – Eastern end of the trail. The Coast-to-Coast Trail will continue over the Max Brewer Bridge in Titusville, through the Merritt Island National Wildlife Refuge to Canaveral National Seashore. ���������������������������������������������������������������������������������������������������������������������������������� ���������������������������������������������������������������������������������������������������������������������� �������������������������������������������������������������������������������������������������� 352.686.0000 • www.C21AllianceRealty.com • 833.300.2121 17 HHEERR Clermont Windermere Bro Remaining phases: ROW: $3,312,500 Construction: $9,387,100 Estimated funding to complete gap: $13,699,600 Estimated funding to complete gap: $16,705,923 *Due to high variability of the route to close this gap, phases are estimated at the highest potential level. **PD&E Programmed for 2016 SPACE COAST GAP OOD NEIGHBOR GAP Remaining phases: i i h Feasibility Study: $350,000 Segment 1: Hiawassee Rd to Pine Hills Rd. PD&E: $30,000 Design: $500,000 Segment 2: Clarcona Ocoee Rd to SEM Co ine to Aurantia Rd 56 Center Orlando RRNNAANNDDOO Bushnell ooksville Winter Park


20643CA
To see the actual publication please follow the link above