Loading And Unloading A Dump Trailer
2) Engage the latch and secure with spring pin. Always secure lock pin prior
91
to operating.
3) Let ramp down for loading.
*WARNING – STAND CLEAR DURING OPERATION*
NEVER stand behind the rear of fenders. Keep 8 ft. clearance to rear and
direct sides of gate.
5.3.1.3 Spreader Gate Operation
1) Disengage bottom latch and secure with spring pin. Always secure lock
pin prior to operating.
2) Raise gate for spreading.
When gate operation is complete, selector valve switch must be placed back in
dump bed position.