*WARNING – STAND CLEAR
DURING OPERATION*
NEVER stand behind the rear
of fenders. Keep 8 ft. clearance
to rear and direct sides
of gate.
5.3.1.3 Spreader Gate Operation
When gate operation is complete,
selector valve switch must be
placed back in dump bed position.
82
LOADING & UNLOADING A DUMP TRAILER