UNIVERSAL MODULAR PLATFORM SYSTEM
ASSEMBLY CRITERIA
Verify proper installation according to ErectaStep installation manual.
In addition, make sure to check the following:
• Ensure all anchor bolts are installed properly at the stair base
and tower.
• Ensure leading edge of platform and stair gusset are flush.
• Ensure tower is vertically plumb.
• Ensure all bolts are properly tightened according to ErectaStep
installation manual.
– Tighten all bolts by hand. No impact wrenches are to be used.
• Ensure that stair guardrail posts are vertically plumb.
page 6