FRONT SLIPPER CONSTRUCTION
STEP-BY-STEP INSTRUCTIONS
A B
Lay a piece of batting overtop of the placement stitches,
being sure to cover them completely. Run your next machine
step, which will be the tacking stitch for your batting.
To begin, start by hooping a piece of Tear-Away stabilizer
and loading the merged slipper toe cover. Run the first
machine step which is the placement stitch for the batting.
NOTE: These instructions are for the right foot. To
complete the left foot, you must mirror each design.
C D BACK OF HOOP
Using a sharp pair of curved tipped scissors, trim away any
excess batting close to the tacking stitch line.
Once trimmed, carefully remove the hoop from the machine
and flip it over so that the back of the design is facing up.
EMBROIDERED SLIPPERS | PROJECT | 211